• Capital Projects

Wyman 1 crane lift on Sat, September 9

A crane lift at Wyman 1 is scheduled for Saturday, September 9, with a weather date of September 16.

The lift will take place between 7 a.m. and 3 p.m. on the date of the lift.  One traffic lane will be blocked at the entrance of the rear parking lot off West 31st Street, so the crane can be set up properly.  Safety barriers, traffic, and pedestrian control will be provided while the crane is on site.

The logistics plan is below:

Wyman 1 crane lift logistics plan for Sep 9, 2023

Chuck Hilseberg

Senior Project Manager
Contact
Email Address