- Active Alert
- Capital Projects
Crane lift at the R. House on Friday, May 30
A crane and support truck will be in the R. House parking lot on Friday, May 30, from 5:30 a.m. to 10 a.m.
The parking lot must be cleared of all vehicles before the crane arrives, and no deliveries will be permitted in the area during the lift.
Key Details:
- Parking Lot Closure: 5:30 a.m. – 10 a.m.
- Crane Arrival and Setup: 5:30 a.m. – 7 a.m.
- Rooftop Equipment Lift: 7 a.m. – 8:30 a.m.
- Crane Demobilization: 8:30 a.m. – 10 a.m.
Logistics Plan: