• Active Alert
  • Capital Projects

Crane lift at the R. House on Friday, May 30

A crane and support truck will be in the R. House parking lot on Friday, May 30, from 5:30 a.m. to 10 a.m.

The parking lot must be cleared of all vehicles before the crane arrives, and no deliveries will be permitted in the area during the lift.

Key Details:

  • Parking Lot Closure: 5:30 a.m. – 10 a.m.
  • Crane Arrival and Setup: 5:30 a.m. – 7 a.m.
  • Rooftop Equipment Lift: 7 a.m. – 8:30 a.m.
  • Crane Demobilization: 8:30 a.m. – 10 a.m.

Logistics Plan: