Crane lift at Steiff Silver Building on April 5
On Saturday, April 5, the Steiff Silver Building will be undergoing a crane lift. The crane will arrive at 7 a.m. for set-up, and the work will begin around 8 a.m. The work is expected to be completed around 2 p.m., and the crane will leave around 3 p.m.
Please refer to the logistics plan below for more information: