Crane Lift at Maryland Hall on Saturday, Oct 26
A crane is scheduled to be at Maryland Hall on Saturday, Oct. 26, from 6 a.m. to 2 p.m. to remove an AHU and exhaust fan from the roof. The crane will be set up on East Campus Drive, the alley between Maryland Hall and the Hopkins Student Center. The alley will be closed, and there will not be any deliveries or parking during this time to allow for the flatbed truck and the crane. There will be sidewalk closures and pedestrian detours per the logistics plan below. Flaggers will be on-site to direct pedestrians to the marked detours and ensure the area is safe.