• Capital Projects

Hodson Hall exterior ramp repair on Friday, April 19

On Friday, April 19, repairs to the brick paved ramp on the south side of Hodson Hall will take place. The work will be completed in two phases so that access to the side door can be maintained. The side door will need to be closed at some point for a small duration (1 – 2 hours) to repair the brick pavers in front of the side door.

Please review the logistics plan below. The green area outlined represents the material staging area and space for one construction vehicle.

Brandon Benjamin

Senior Project Manager
Contact
Email Address