- Capital Projects
SNF Agora crane removal
A crane will be removed from the SNF Agora construction site on Monday, Aug. 28. Crane removal will occur between 6:30 and 8 a.m., 9:30 a.m. to 4:30 p.m., and 6 to 7 p.m. You are encouraged to plan for additional travel time down Wyman Park Drive during those times.